The phase 1 development at 2001 Fortune Drive provides 8 MW of critical load; the property has received over $100 million in total investment including seismic, utility, and other capital upgrades.
DPR Construction served as the General Contractor. Rosendin Electric and Therma Corporation performed the electrical and mechanical work respectively. EYP Mission Critical Facilities provided commissioning oversight and integrated commissioning testing services.
Phase 1 facility features include:
- High-Availability, N+1 to 2N Redundancy on all systems
- Entire critical load fully Level 5 Commissioned
- Supports minimum energy densities of 185 watts/sq ft throughout
- Structurally Sound:Â Facility meets FEMA 356 "Essential Facility" category
- Seismically Reinforced: All improvements seismically reinforced to a 1.5 Structural Importance Factor
- Carrier-Neutral: AboveNet, Level 3, and AT&T in the MMR; Verizon and XO communications in nearby vaults
- Mission Critical Operations: 24 x 7 on-site security; ISO 9001 Engineering & Maintenance